European-style prefabricated high-voltage power distribution equipment is classified into two types based on the incoming line method: terminal type and ring network type. Based on the incoming line location, it can be divided into two types: overhead line entry from the top of the enclosure (commonly used in traditional prefabricated substations) and underground entry and exit via high-voltage cable trenches, which is the more common method in modern designs.
SF6 series load switches, using SF6 gas as the arc-extinguishing medium, are more common, and their cost is higher than that of FN-10 series high-voltage load switches. These switches have structures with or without fuses, and include grounding switches, but generally all are equipped with a live indicator. The operating mechanism is generally manual, but electric operation is also possible. Those with fuses can automatically disconnect the switch in the event of a short-circuit fault, protecting the circuit and equipment such as transformers and switches.
There are also vacuum switches, using vacuum as the arc-extinguishing medium. These switches can be used alone, with fuses, or in series with SF6 series load switches; however, this increases the cost, and such use is not necessary unless there are specific user requirements.
High-voltage metering: In high-voltage power distribution systems, high-voltage metering cabinets must be installed if users require high-voltage metering.
There is no unified requirement among power supply departments across China regarding high-voltage or low-voltage metering. Northwest China's power supply regulations stipulate that high-voltage metering must be used when the transformer capacity exceeds 160KVA; the high-voltage metering cabinet switch must be controlled by the power supply department. Power supply departments in North China, such as Beijing and Tianjin, believe that metering in prefabricated substations should ideally be done on the low-voltage side. This improves power supply reliability, reduces instability caused by high-voltage metering, and the losses to the transformer itself can be converted into electricity charges and borne by the user.
The structure of a prefabricated substation high-voltage metering cabinet generally consists of: a current transformer (CT), a power presenter (PT), metering instruments, and remote control/telemetry devices.
